Progress has veen slow because we've been ill, and we still are. Yesterday we got almost all the welds in the frame done except the propshaft tunnel and some minor tubes. We've got a Yamaha R1 engine in the engine bay so we can design the propshaft and the engine mounts. Seems like at this point the rear axle will be a Opel unit. We ordered the roll cage kit and they will probably arrive early next week. Also the tubing for the suspension has been ordered, and hopefully it will also arrive on next week.
I'll post pictures of the engine later.
-Mika
Monday, October 23, 2006
Monday, October 9, 2006
Both locost frames are coming along quite well
Both frames are now in the same stage. Next we will weld the "trunk" area and then we will move on to the suspension mounting points.
-Mika
Subscribe to:
Posts (Atom)